Thursday, 4 April 2013

The lead up to the Easter break started with the site covered in snow - as shown in the picture.
After we had assessed the safety and removed snow from the road and walkway areas, we were able to continue with drainage on the main site road. Once the drainage was completed we could look to get the road construction under way.
 
The road is rolled flat and a suitable material is then used to take the level of the new road to its new formation level.
 
 


 