We have installed the tarmac road base that we mentioned in the last post and are now on with erecting the scaffolding to allow the timber frame to commence next week around Block 1. Over on Block 2 the Beam & Block floor is being installed with the use of a crane.




No comments:
Post a Comment
Note: only a member of this blog may post a comment.