Friday, 5 July 2013
Roofing
The roof is now completely covered on Block 2 and we have commenced installing the internal insulation. On the roof areas the render is installed as shown in the photograph.
Block 1 is continuing with plasterboard and internal wall construction.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)