Monday, 13 May 2013

We hope you all enjoyed the May Day bank holiday that came with good weather for a change! Tuesday after the bank holiday we installed the 2nd floor wall panels to plots 10 & 11 together with the communal walls and lifted the roof trusses for Plots 9 & 12 into position. The progress has continued throughout the week culminating Friday with installation of the floor cassettes to Plots 13 & 14 and lifting wall panels into position on Plot 12. The main structure is now nearing completion on Block 1 and we hope that by the end of next week all of the roofs will be in place.
 

 