Friday, 3 May 2013

Block 1 is progressing with the timber frame and we have constructed the 1st floor walls and placed the 2nd floor cassettes. The fire barriers are being fitted as the building progresses and can be viewed on the photographs as the red polythene. The red bags contain a mineral wool fire protection material. Block 2 has had the gas protection membrane fitted and insulation. A concrete floor screed is also now placed that will form the ground floor of the apartments.
 



 